Dual Chamber design
Material of Construction - Heavy duty steel
Insulated and Refractory lined chambers
Burners in various fuel options
Emergency stack to vent out the gases incase of power failure
Quencher to reduce the flue gas temperature
Venturi Scrubber high energy air pollution control device (Wet Scrubber) with Stainless Steel -316L Construction for cleaning of gases
Droplet Separator (for separation of water droplets from flue gases) cum re-circulation tank
Re-circulation pump
Packed Bed Scrubber for purification of gases
F D Fan for providing air inside primary and secondary chamber
I D Fan to maintain the negative draft and control the gas flow
Fuel Oil Tank & Piping
Electrical Control Panel
Interconnecting ducts & piping
Chimney of 5,10,15,30 mtrs height from ground level OR as per country's regulation and client's requirement
Low running & maintenance cost
Environment Friendly
Installation with the help of installation manual and drawings/By ATL's engineer

Product Videos